Featured Project: Momentum Engineered Systems, inc.

Published March 29, 2019 by Whirlwind Team

M5

Trey Maxwell enlisted the services of long-time Whirlwind customer, Morris Fendly (Mayan Builders), to build a new fabrication warehouse for his company, Momentum Engineered Systems, Inc..

They will be producing products for the oil & gas industry from this location as well as house their primary offices. Maxwell plans to expand on the property and build additional warehouses. John Hoover, Operations Manager, stated that the new space is exciting to have and looks forward to growing into it. 

M6

M7

One of the attractions of this building Fendly was fond of was the colors and combination of office and warehouse. The building’s features include brick facade wainscoting on the office section as an accent while Royal Blue trim modestly contrasts with Old Town Grey throughout. The warehouse portion of the building stands at 32 feet tall and features two 5-ton cranes. 

M4

Due to our convenient location in the Houston area, as well as our reputation to be thorough and always do the right thing, Fendly looks forward to continuing to work with Whirlwind.

M1

M2

M3

PROJECT DETAILS
Location E Orem Dr. Houston, TX 77075
Owner Trey Maxwell - President of Momentum Engineered Systems
GC Mayan Builders
Erected by: Diamond Erectors
Products Used

Super Span X (wall panels and warehouse roof)

Super Seam II (office roof)

Learn more about Whirlwind Metal Warehouses

REQUEST MORE INFORMATION

   

Contact Us Now